Our dedicated maintenance team has been hard at work throughout November to ensure the course remains in top condition for your enjoyment. Here’s what we’ve accomplished:
- Minor renovations were carried out on River Nine greens to maintain its pristine playing conditions.
- The black soil thatch layer at the back of Green 27 was removed to prevent water from stagnating and areas from getting soggy.
- Solid tine aeration was carried out across all greens to reduce soil compaction, enhance airflow, and improve rainwater percolation, to promote healthier root systems.
- Insecticide was applied on greens to prevent worm attacks and to protect the turf.
- Fungicide was sprayed to control disease outbreaks brought on by the rainy season.
- Completion of works and repairs at the first section of concrete beam and bridge base at Hole 7.
Upcoming Works:
- To continue bridge repair efforts at Hole 7.
- Subsoil improvements at Hole 14 to enhance soil structure and drainage.
- Returfing efforts at the erosion site on Hole 22 to restore the area and prevent further soil loss.
- Preparations for December Monthly Medal tournament.
We appreciate your patience and understanding as we carry out these essential maintenance activities. Our goal is to provide you with the best possible golfing experience. Thank you for your continued support.